← Back to Bill Feed
FederalPassed Both Chambers

SECURE Grid Act

Introduced Jan 27, 2026 · Last action Jul 13, 2026 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Track this bill

Save bills and get alerts when status changes.

Sign in to saved bills.

Summary

This legislation is called the SECURE Grid Act. It is being reviewed by a committee.

Full bill text

[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 7257 Introduced in House (IH)]

<DOC>

119th CONGRESS
  2d Session
                                H. R. 7257

 To amend the Energy Policy and Conservation Act to require States to
include supporting the physical security, cybersecurity, and resilience
     of local distribution systems in State energy security plans.

_______________________________________________________________________

                    IN THE HOUSE OF REPRESENTATIVES

                            January 27, 2026

 Mr. Latta (for himself and Ms. Matsui) introduced the following bill;
       which was referred to the Committee on Energy and Commerce

_______________________________________________________________________

                                 A BILL

 To amend the Energy Policy and Conservation Act to require States to
include supporting the physical security, cybersecurity, and resilience
     of local distribution systems in State energy security plans.

    Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the ``Securing Community Upgrades for a
Resilient Grid Act'' or the ``SECURE Grid Act''.

SEC. 2. CONSIDERATION OF THE SECURITY OF LOCAL DISTRIBUTION SYSTEMS IN
              STATE ENERGY SECURITY PLANS.

    Section 366 of the Energy Policy and Conservation Act (42 U.S.C.
6326) is amended--
            (1) in subsection (a), by adding at the end the following:
            ``(3) Local distribution system.--The term `local
        distribution system' means any energy infrastructure owned and
        operated by an electric utility at a voltage of 100 kilovolts
        or less.'';
            (2) in subsection (b)(2), by inserting ``, and suppliers of
        equipment for the generation, transmission, and distribution of
        electricity to,'' after ``owners and operators of'';
            (3) in subsection (c)--
                    (A) by amending paragraph (3) to read as follows:
            ``(3) address potential hazards to each energy sector or
        system, including--
                    ``(A) physical threats and vulnerabilities,
                including--
                            ``(i) weather-related threats and
                        vulnerabilities;
                            ``(ii) physical attacks on local
                        distribution systems and the bulk-power system;
                        and
                            ``(iii) supply chain risks for equipment
                        for the generation, transmission, and
                        distribution of electricity; and
                    ``(B) cybersecurity threats and vulnerabilities,
                including threats to, and vulnerabilities of, local
                distribution systems that may impact the bulk-power
                system;''; and
                    (B) by amending paragraph (5) to read as follows:
            ``(5) provide a risk mitigation approach to enhance
        reliability and end-use resilience, including methods of
        responding to, mitigating, and recovering from potential
        hazards described in paragraph (3); and'';
            (4) in subsection (d)(3)--
                    (A) in subparagraph (A), by striking ``and'' at the
                end;
                    (B) by redesignating subparagraph (B) as
                subparagraph (C); and
                    (C) by inserting after subparagraph (A) the
                following:
                    ``(B) supplying equipment for the generation and
                transmission of electricity; and'';
            (5) in subsection (e)--
                    (A) by striking ``A State is not eligible'' and
                inserting the following:
            ``(1) Submission required.--A State is not eligible'';
                    (B) in paragraph (2), by redesignating
                subparagraphs (A) and (B) as clauses (i) and (ii),
                respectively;
                    (C) by redesignating paragraphs (1) and (2) as
                subparagraphs (A) and (B), respectively; and
                    (D) by adding at the end the following:
            ``(2) State determination.--A submission under paragraph
        (1) is not required to be approved by the Secretary.'';
            (6) in subsection (h), by inserting ``, local distribution
        system,'' after ``electric utility''; and
            (7) in subsection (i), by striking ``2025'' and inserting
        ``2030''.
                                 <all>

Official legislative text sourced from the public record (cached on CivicsHQ).

Official source

View the original bill, actions, and full legislative record on Congress.gov.

View on Congress.govopen_in_new

Status

Passed Both Chambers

  1. 1Introduced
  2. 2Committee
  3. 3Floor
  4. 4Passed
  5. 5Signed

Timeline reflects current normalized status only. Full action history is not yet stored in the API.

Votes

Voting records are not yet available for this bill.