← Back to Bill Feed
FederalIn Committee

Data Infrastructure Energy Measurement and Standards Act

Introduced Jun 18, 2026 · Last action Jun 25, 2026 Ordered to be Reported in the Nature of a Substitute (Amended) by the Yeas and Nays: 34 - 1.

Track this bill

Save bills and get alerts when status changes.

Sign in to saved bills.

Summary

This legislation is called the Data Infrastructure Energy Measurement and Standards Act. Ordered to be Reported in the Nature of a Substitute (Amended) by the Yeas and Nays: 34 - 1.

Full bill text

[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 9372 Introduced in House (IH)]

<DOC>

119th CONGRESS
  2d Session
                                H. R. 9372

   To direct the Director of the National Institute of Standards and
 Technology to develop best practices for measuring data center energy
use, study data availability for the purpose of improving energy demand
           forecasting capabilities, and for other purposes.

_______________________________________________________________________

                    IN THE HOUSE OF REPRESENTATIVES

                             June 18, 2026

    Mr. Subramanyam (for himself, Mr. Obernolte, and Mrs. Foushee)
 introduced the following bill; which was referred to the Committee on
                     Science, Space, and Technology

_______________________________________________________________________

                                 A BILL

   To direct the Director of the National Institute of Standards and
 Technology to develop best practices for measuring data center energy
use, study data availability for the purpose of improving energy demand
           forecasting capabilities, and for other purposes.

    Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the ``Data Infrastructure Energy
Measurement and Standards Act''.

SEC. 2. ACTIVITIES TO SUPPORT METROLOGY OF DATA CENTER ENERGY USE.

    (a) Best Practices for Measuring Data Center Energy Use.--The
Director of the National Institute of Standards and Technology, in
consultation with the Secretary of Energy, shall carry out a
measurement research program (in this section referred to as the
``program'') to inform the development or improvement of best
practices, definitions, methodologies, procedures, and technical
standards for the measurement of energy and water use by data centers
and the workloads of such centers, including the measurement of energy
and water use resulting from training and inference of artificial
intelligence models or other compute intensive information processes.
    (b) Activities.--In carrying out the program, the Director shall
carry out the following:
            (1) Conduct research and testing to improve the accuracy,
        efficacy, timeliness, and reliability of the measurement of
        energy and water use by data centers and the workloads of such
        centers.
            (2) Develop or identify best practices, guidelines,
        definitions, methodologies, and procedures for measuring and
        reporting energy and water use by data centers and the
        workloads of such centers, taking into consideration the
        following:
                    (A) The type of workload and aggregate energy and
                water use by a given data center, including complex
                artificial intelligence workloads.
                    (B) Temporal power consumption load profiles
                associated with data center energy use accounting for
                behind-the-meter generation, front-of-meter generation,
                and energy generation not provided to the electric grid
                on a facility-level basis.
                    (C) Varying information technology system, power
                chain, and cooling configurations, including
                consideration of servers, storage, network, power
                transformation, distribution, and uninterruptible
                supply technologies.
                    (D) Temporal variations in electricity loads due to
                variations in workloads, technology configurations, and
                data center locations, including local climate and
                resource factors.
            (3) Study data needs for relevant research and energy and
        water demand forecasting, and relevant driving factors relating
        to such needs, including an identification of the following:
                    (A) Existing gaps in the following:
                            (i) Data collection.
                            (ii) Data availability from public and non-
                        public sources.
                            (iii) Researcher access.
                    (B) Risks related to the gaps identified in clauses
                (i) through (iii) of subparagraph (A), including the
                reliability of energy and water demand forecasts from
                different stakeholder perspectives.
            (4) Support the development of standardized metrics and
        data sharing mechanisms that would help provide information to
        researchers and relevant stakeholders regarding data center
        energy and water use in such a way that promotes improved
        energy and water demand forecasting capabilities.
            (5) Coordinate with the Secretary of Energy to carry out
        the following:
                    (A) Ensure applicable metrics and data are managed,
                stewarded, and archived appropriately, and in
                accordance with the best practices described in
                paragraph (2).
                    (B) Promote full and open exchange of such metrics
                and data at Federal and State levels, and with
                academia, industry, and other users, as practicable and
                appropriate.
            (6) Coordinate with international partners, including
        international standards organizations, to maintain global data
        center energy measurement standards.
    (c) Stakeholder Engagement.--In carrying out subsection (b), the
Director shall seek to engage with and convene representatives of
industry, academia, nonprofit organizations, standards development
organizations, civil society groups, and appropriate Federal
departments and agencies.
    (d) Briefings.--Not later than one year after the date of the
enactment of this Act, and again not later than two years after such
date, the Director shall brief the Committee on Science, Space, and
Technology of the House of Representatives and the Committee on
Commerce, Science, and Transportation and the Committee on Energy and
Natural Resources of the Senate on the program.
    (e) Authorization of Appropriations.--There are authorized to be
appropriated to the Director to carry out this section $10,000,000 for
each of fiscal years 2027 through 2029.
    (f) Definitions.--In this section:
            (1) Artificial intelligence.--The term ``artificial
        intelligence'' has the meaning given such term in section 5002
        of the National Artificial Intelligence Initiative Act of 2020
        (15 U.S.C. 9401).
            (2) Artificial intelligence model.--The term ``artificial
        intelligence model'' means a software component of an
        information system that implements artificial intelligence
        technology and uses computational, statistical, or machine-
        learning techniques to produce outputs from a defined set of
        inputs.
            (3) Behind-the-meter generation.--The term ``behind-the-
        meter generation'' means the generation or storage of energy,
        including electricity and fuels consumed in backup and onsite
        generation, using a system that operates on the customer side
        of the applicable utility meter.
            (4) Data center.--The term ``data center'' means any
        facility that primarily contains electronic equipment used to
        process, store, or transmit digital information.
            (5) Director.--The term ``Director'' means the Director of
        the National Institute of Standards and Technology.
            (6) Front-of-meter generation.--The term ``front-of-meter
        generation'' means the generation of energy at a facility
        directly connected to a grid with the primary purpose of
        providing electricity to one or more offsite locations via such
        grid or utility meters with which such facility does not have
        an electrical connection.
            (7) Information system.--The term ``information system''
        has the meaning given such term in section 3502 of title 44,
        United States Code.
                                 <all>

Official legislative text sourced from the public record (cached on CivicsHQ).

Official source

View the original bill, actions, and full legislative record on Congress.gov.

View on Congress.govopen_in_new

Status

In Committee

  1. 1Introduced
  2. 2Committee
  3. 3Floor
  4. 4Passed
  5. 5Signed

Timeline reflects current normalized status only. Full action history is not yet stored in the API.

Votes

Voting records are not yet available for this bill.