FREEDOM Act

Introduced Feb 3, 2026 · Last action Mar 20, 2026 Referred to the Subcommittee on Commodity Markets, Digital Assets, and Rural Development.

Track this bill

Save bills and get alerts when status changes.

Sign in to saved bills.

Summary

This legislation is called the FREEDOM Act. Referred to the Subcommittee on Commodity Markets, Digital Assets, and Rural Development.

Full bill text

[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 7329 Introduced in House (IH)]

<DOC>

119th CONGRESS
  2d Session
                                H. R. 7329

To amend the Energy Act of 2020, the Geothermal Steam Act of 1970, the
 Energy Policy Act of 2005, and the Mineral Leasing Act to streamline
 the leasing and permitting processes of Federal agencies for certain
     energy and mineral projects, to clarify Federal authorization
  requirements for certain projects on non-Federal land, to establish
  enforceable Federal authorization timelines and expedited judicial
remedies, to limit Federal actions halting fully permitted projects, to
   create a de-risking compensation program, and for other purposes.

_______________________________________________________________________

                    IN THE HOUSE OF REPRESENTATIVES

                            February 3, 2026

Mr. Harder of California (for himself, Mr. Lawler, Mr. Bacon, Mr. Gray,
  Mr. Edwards, and Ms. McDonald Rivet) introduced the following bill;
   which was referred to the Committee on Natural Resources, and in
    addition to the Committees on Agriculture, Energy and Commerce,
Transportation and Infrastructure, Science, Space, and Technology, and
   the Judiciary, for a period to be subsequently determined by the
  Speaker, in each case for consideration of such provisions as fall
           within the jurisdiction of the committee concerned

_______________________________________________________________________

                                 A BILL

To amend the Energy Act of 2020, the Geothermal Steam Act of 1970, the
 Energy Policy Act of 2005, and the Mineral Leasing Act to streamline
 the leasing and permitting processes of Federal agencies for certain
     energy and mineral projects, to clarify Federal authorization
  requirements for certain projects on non-Federal land, to establish
  enforceable Federal authorization timelines and expedited judicial
remedies, to limit Federal actions halting fully permitted projects, to
   create a de-risking compensation program, and for other purposes.

    Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the ``Fighting for Reliable Energy and
Ending Doubt for Open Markets Act'' or the ``FREEDOM Act''.

SEC. 2. FINDINGS.

    Congress finds that--
            (1) energy projects face catastrophic financial losses when
        Federal agencies revoke permits, fail to adhere to deadlines,
        or take years to process routine applications for those
        projects, even in cases in which project sponsors have invested
        millions of dollars in reliance on Federal approvals;
            (2) the regulatory uncertainty described in paragraph (1)--
                    (A) deters critical energy infrastructure
                investment across all technologies; and
                    (B) undermines United States energy security and
                economic competitiveness; and
            (3) regulatory uncertainty and permitting delays increase
        the cost of building energy and mineral infrastructure, which
        raises the cost of living for American families and increases
        power prices for homes and businesses.

SEC. 3. AMENDMENT TO ENERGY ACT OF 2020.

    (a) In General.--The Energy Act of 2020 (division Z of the
Consolidated Appropriations Act, 2021 (Public Law 116-260; 134 Stat.
2418)) is amended by adding at the end the following:

  ``TITLE XII--FIGHTING FOR RELIABLE ENERGY AND ENDING DOUBT FOR OPEN
                                MARKETS

                       ``Subtitle A--Definitions

``SEC. 12001. DEFINITIONS.

    ``In this title:
            ``(1) Agency.--The term `agency' has the meaning given the
        term in section 551 of title 5, United States Code.
            ``(2) Authorization.--The term `authorization' means--
                    ``(A) any license, permit, approval, finding,
                determination, or administrative decision issued by an
                agency; and
                    ``(B) any interagency consultation that is
                authorized or required to be conducted under Federal
                law--
                            ``(i) between or among--
                                    ``(I) agencies; and
                                    ``(II) in the case of any State
                                that chooses to participate in the
                                environmental review of a covered
                                energy project, 1 or more State
                                agencies; and
                            ``(ii) in order to site, construct,
                        reconstruct, or commence operation of a covered
                        energy project.
            ``(3) Complex authorization.--The term `complex
        authorization' means an authorization identified as a complex
        authorization by a lead agency under section 12301(d).
            ``(4) Covered energy project.--The term `covered energy
        project' means any activity carried out in the United States
        that involves the construction of infrastructure--
                    ``(A) to develop, produce, generate, store,
                transport, or distribute energy;
                    ``(B) to capture, remove, transport, or store
                carbon dioxide; or
                    ``(C) to mine, extract, beneficiate, or process
                minerals.
            ``(5) Environmental document.--
                    ``(A) In general.--The term `environmental
                document' means--
                            ``(i) an environmental assessment;
                            ``(ii) a finding of no significant impact;
                            ``(iii) a notice of intent;
                            ``(iv) an environmental impact statement;
                        and
                            ``(v) a record of decision.
                    ``(B) Inclusions.--The term `environmental
                document' includes any document that is--
                            ``(i) a supplement to a document described
                        in subparagraph (A); or
                            ``(ii)(I) related to a document described
                        in subparagraph (A); and
                            ``(II) prepared pursuant to a court order.
            ``(6) Environmental impact statement.--The term
        `environmental impact statement' means a detailed, written
        statement required under section 102(2)(C) of the National
        Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).
            ``(7) Environmental review.--The term `environmental
        review' means any agency procedure or process for--
                    ``(A) applying a categorical exclusion (within the
                meaning of the National Environmental Policy Act of
                1969 (42 U.S.C. 4321 et seq.) (including regulations
                promulgated pursuant to that Act)); or
                    ``(B) preparing an environmental document under the
                National Environmental Policy Act of 1969 (42 U.S.C.
                4321 et seq.).
            ``(8) Lead agency.--The term `lead agency', with respect to
        a covered energy project, means the agency with principal
        responsibility for environmental review of the covered energy
        project under the National Environmental Policy Act of 1969 (42
        U.S.C. 4321 et seq.) (including regulations promulgated
        pursuant to that Act).
            ``(9) Project sponsor.--The term `project sponsor' means a
        private, public, or public-private entity seeking an
        authorization for a covered energy project.
            ``(10) Reviewing court.--The term `reviewing court' means
        the court in which a petition described in paragraph (1) of
        section 12403(a) is filed, subject to paragraph (2)(B) of that
        section.
            ``(11) Routine authorization.--The term `routine
        authorization' means any authorization that is not a complex
        authorization.

         ``Subtitle B--Federal Land Energy and Mineral Reforms

``SEC. 12101. ACCELERATING FEDERAL LAND RIGHTS-OF-WAY FOR CERTAIN
              COVERED ENERGY PROJECTS.

    ``(a) Definition of Eligible Project.--In this section, the term
`eligible project' means a covered energy project for which the project
sponsor seeks a right-of-way under section 501 of the Federal Land
Policy and Management Act of 1976 (43 U.S.C. 1761).
    ``(b) Cost Recovery.--Not later than 30 days after the date on
which a project sponsor submits a complete application for a right-of-
way under section 501 of the Federal Land Policy and Management Act of
1976 (43 U.S.C. 1761) for an eligible project, the Secretary of the
Interior or the Secretary of Agriculture, as applicable, shall issue a
cost recovery agreement relating to the eligible project, if a cost
recovery agreement is required under section 2804.14 of title 43, Code
of Federal Regulations (or a successor regulation), or section 251.58
of title 36, Code of Federal Regulations (or a successor regulation).
    ``(c) Low-Disturbance Activities for Eligible Projects.--
            ``(1) In general.--Not later than 180 days after the date
        of enactment of this title, to facilitate timely permitting of
        eligible projects, the Secretary of the Interior and the
        Secretary of Agriculture each shall develop or adopt 1 or more
        categorical exclusions, including allowing for extraordinary
        circumstances under which the categorical exclusion shall not
        be available, under the National Environmental Policy Act of
        1969 (42 U.S.C. 4321 et seq.) for low-disturbance activities
        described in paragraph (2) that are necessary for eligible
        projects.
            ``(2) Activities described.--Low-disturbance activities
        referred to in paragraph (1) include the following:
                    ``(A) An individual surface disturbance of less
                than 5 acres for which a site-specific analysis has
                previously been completed in an environmental document
                under the National Environmental Policy Act of 1969 (42
                U.S.C. 4321 et seq.).
                    ``(B) An activity at a location at which the same
                type of activity has previously occurred during the 5-
                year period preceding the date of commencement of the
                activity.
                    ``(C) An activity on previously disturbed or
                developed (as defined in section 1021.102(g)(1) of
                title 10, Code of Federal Regulations (as in effect on
                the date of enactment of this title) land that was
                analyzed, in an approved land use plan or an
                environmental document prepared under the National
                Environmental Policy Act of 1969 (42 U.S.C. 4321 et
                seq.)), as a reasonably foreseeable activity, subject
                to the condition that the land use plan or
                environmental document was approved during the 5-year
                period preceding the date of commencement of the
                activity.
                    ``(D) Maintenance of a minor activity, other than
                construction or major renovation, of a building or
                facility.
                    ``(E) A preliminary geotechnical investigation.
                    ``(F) The construction or removal of a
                meteorological evaluation tower.

             ``Subtitle C--De-Risking Compensation Program

``SEC. 12201. DEFINITIONS.

    ``In this subtitle:
            ``(1) Capital contribution.--The term `capital
        contribution', with respect to a covered energy project, means
        the sum of--
                    ``(A) any amounts expended by the project sponsor
                for the covered energy project; and
                    ``(B) any amounts the project sponsor is obligated
                to expend for the covered energy project under an
                executed contract, binding commitment, or financing
                agreement, including verifiable expenditures for
                development, construction, permitting, and financing
                costs directly related to the covered energy project.
        The term `capital contribution' shall not include executive
        compensation, bonuses, equity awards, general corporate
        overhead, lobbying, public relations, dividends, or profit.
            ``(2) Court.--The term `Court' means the United States
        Court of Federal Claims.
            ``(3) Program.--The term `Program' means the De-Risking
        Compensation Program established by section 12202(a).
            ``(4) Secretary.--The term `Secretary' means the Secretary
        of Energy.

``SEC. 12202. ESTABLISHMENT; PURPOSES.

    ``(a) Establishment.--There is established in the Department of
Energy a program, to be known as the `De-Risking Compensation Program',
to provide compensation to project sponsors of covered energy projects
that suffer unrecoverable losses due to an event described in section
12204(a), as determined by the Court in accordance with this subtitle.
    ``(b) Purposes.--The purposes of the Program are--
            ``(1) to reduce regulatory risks for energy infrastructure
        developers;
            ``(2) to facilitate timely permitting and financing of
        projects essential to United States energy security and
        economic competitiveness; and
            ``(3) to provide compensation in cases in which an agency
        action, inaction, or delay causes a covered energy project to
        be cancelled, unviable, or subject to an unrecoverable loss.

``SEC. 12203. ENROLLMENT.

    ``(a) Eligibility.--A project sponsor shall be eligible to enroll
in the Program with respect to a covered energy project if the project
sponsor--
            ``(1) exercises control over the covered energy project;
        and
            ``(2) submits to the Secretary an application under
        subsection (b)--
                    ``(A) after the submission of a notice of
                initiation for the covered energy project under section
                12301(a); but
                    ``(B) not later than 90 days after the completed
                notice date (as defined in section 12302(a)) of the
                covered energy project.
    ``(b) Applications.--
            ``(1) In general.--A project sponsor seeking enrollment in
        the Program shall submit to the Secretary an application, in
        such form, in such manner, and containing such information as
        the Secretary may require, subject to the condition that the
        required information shall be only that necessary--
                    ``(A) to verify the eligibility of the project
                sponsor under subsection (a); and
                    ``(B) to calculate the premium to be charged to the
                project sponsor under subsection (d)(1).
            ``(2) Limitation.--The Secretary shall not accept an
        application under this subsection relating to a covered energy
        project that is submitted after the occurrence of an event
        described in section 12204(a) with respect to the covered
        energy project.
    ``(c) Determination by Secretary.--Not later than 90 days after the
date of receipt of an application under subsection (b), the Secretary
shall--
            ``(1) determine whether the application meets the
        requirements of that subsection; and
            ``(2) on making--
                    ``(A) a positive determination under paragraph (1),
                enroll the project sponsor in the Program; or
                    ``(B) a negative determination under paragraph (1),
                deny enrollment in the Program.
    ``(d) Premiums and Fees.--
            ``(1) Annual premium.--
                    ``(A) In general.--As a condition of enrollment in
                the Program, a project sponsor shall pay to the
                Secretary an annual premium in accordance with
                subparagraph (B).
                    ``(B) Amount.--
                            ``(i) In general.--Subject to clause (ii),
                        the amount of the annual premium paid by a
                        project sponsor under subparagraph (A) shall be
                        equal to 1.5 percent of the capital
                        contribution of the project sponsor to the
                        covered energy project.
                            ``(ii) Adjustment.--The Secretary may
                        increase the amount of a premium charged to a
                        project sponsor under clause (i) by not more
                        than 1.5 percentage points, as the Secretary
                        determines to be necessary to ensure the
                        solvency of the Program.
                    ``(C) Deposit.--The Secretary shall deposit the
                premiums collected pursuant to this paragraph in the
                De-Risking Compensation Fund established by section
                12205(a).
            ``(2) No enrollment fee.--No enrollment fee may be charged
        for enrollment in the Program.
    ``(e) Administrative Record.--
            ``(1) In general.--For each covered energy project with
        respect to which a project sponsor is enrolled in the Program,
        the Secretary shall maintain an administrative record, which
        shall consist of--
                    ``(A) the application submitted by the project
                sponsor under subsection (b); and
                    ``(B) the premium payment history of the project
                sponsor.
            ``(2) Certification.--Not later than 30 days after the date
        of receipt of a request from a project sponsor enrolled in the
        Program, the Secretary shall certify and submit to the Court
        the administrative record maintained under paragraph (1) with
        respect to the applicable covered energy project.

``SEC. 12204. COMPENSATION OF ENROLLED PROJECT SPONSORS.

    ``(a) Triggering Events.--A project sponsor enrolled in the Program
may receive from the Secretary compensation in accordance with this
section if the Court determines that the covered energy project of the
project sponsor has suffered an unrecoverable loss due to any of the
following events:
            ``(1) Revocation, cancellation, or vacatur of an
        authorization.
            ``(2) Failure by an agency to issue a final decision
        regarding an authorization by the applicable deadline under
        subsection (b) or (c) of section 12302.
            ``(3) Failure by an agency to act on a remand, renewal, or
        reapproval relating to the covered energy project by the date
        that is 180 days after the date on which the agency received
        the remand, renewal request, or reapproval request, as
        applicable.
            ``(4) Failure by an agency to adhere to a deadline required
        under another Federal law.
            ``(5) Inaction or unreasonable delay by an agency that--
                    ``(A) causes the cancellation of the covered energy
                project; or
                    ``(B) renders the covered energy project
                commercially unviable.
    ``(b) Claims for Compensation.--
            ``(1) In general.--Not later than the date described in
        paragraph (2), a project sponsor enrolled in the Program may
        bring an action in the Court seeking compensation from the
        Secretary with respect to a covered energy project.
            ``(2) Description of date.--The date referred to in
        paragraph (1) is the date that is 180 days after the later of--
                    ``(A) the date on which an event described in
                subsection (a) occurs with respect to the applicable
                covered energy project; and
                    ``(B) the first date on which the project sponsor
                knew, or reasonably should have known, of--
                            ``(i) an unrecoverable loss suffered by the
                        covered energy project; and
                            ``(ii) the causal connection of that loss
                        to an event described in subsection (a).
            ``(3) Contents.--A claim filed with the Court under this
        subsection shall include documentation, certified by a
        qualified accountant, demonstrating--
                    ``(A) enrollment of the project sponsor in the
                Program with respect to the applicable covered energy
                project;
                    ``(B) the total capital contribution of the project
                sponsor to the covered energy project; and
                    ``(C)(i) each unrecoverable loss claimed with
                respect to the covered energy project; and
                    ``(ii) the causal connection of that loss to an
                event described in subsection (a).
    ``(c) Judicial Review.--
            ``(1) Exclusive jurisdiction.--The Court shall have
        exclusive jurisdiction over any action brought under this
        section.
            ``(2) Standard and scope of review.--In an action under
        this section, the Court shall--
                    ``(A) review the matter based on the administrative
                record submitted by the Secretary under section
                12203(e)(2), subject to paragraph (3); and
                    ``(B) determine de novo--
                            ``(i) whether the project sponsor has
                        established, by a preponderance of the
                        evidence, entitlement to compensation under the
                        Program; and
                            ``(ii) if such an entitlement is so
                        established, the amount of compensation to be
                        provided, in accordance with subsection (d).
            ``(3) Failure to certify or submit record.--If the
        Secretary fails to maintain an administrative record as
        required under paragraph (1) of section 12203(e), or fails to
        certify or submit to the Court such a record by the applicable
        deadline under paragraph (2) of that section, the Court may
        proceed in the applicable action under this section on the
        basis of--
                    ``(A) the evidence submitted by the project
                sponsor; and
                    ``(B) any other evidence the Court determines to be
                appropriate.
    ``(d) Payments.--
            ``(1) Judgment.--
                    ``(A) In general.--On determining that a project
                sponsor is entitled to receive compensation in an
                action under this section, the Court shall enter a
                judgment ordering the Secretary to pay the awarded
                amount from the De-Risking Compensation Fund
                established by section 12205(a), subject to
                subparagraph (B).
                    ``(B) Minimum capital contribution.--The Court may
                not award compensation to a project sponsor under this
                subsection with respect to a covered energy project
                unless the project sponsor demonstrates, through the
                documentation submitted under subsection (b)(3), that
                the capital contribution of the project sponsor to the
                covered energy project is equal to not less than
                $5,000,000.
            ``(2) Amount.--
                    ``(A) Limitation.--The amount of compensation
                provided to a project sponsor under this subsection
                shall not exceed an amount equal to the total capital
                contribution of the project sponsor to the applicable
                covered energy project.
                    ``(B) Offset.--The Court shall reduce the amount of
                compensation provided to a project sponsor under this
                subsection by the amount of any award, settlement
                payment, insurance recovery, or other compensation
                received by the project sponsor for the same
                unrecoverable loss arising from the same agency action,
                inaction, delay, or order that is the subject of the
                action under this section.
                    ``(C) No double recovery.--A project sponsor may
                not receive compensation under this subtitle for any
                loss for which the project sponsor has been compensated
                under subtitle E.
            ``(3) Action by secretary.--The Secretary shall provide to
        a project sponsor a payment awarded by the Court under this
        section by not later than 30 days after the date on which the
        judgment under paragraph (1) ordering that payment becomes
        final.
    ``(e) Limitations on Denial.--The Court and the Secretary may not
deny a claim submitted by a project sponsor under this subtitle based
on--
            ``(1) the merits of the covered energy project that is the
        subject of the claim; or
            ``(2) a type of technology employed by that covered energy
        project.
    ``(f) Appeals.--A judgment of the Court under this section shall be
subject to judicial review in the United States Court of Appeals for
the Federal Circuit in accordance with section 1295 of title 28, United
States Code.

``SEC. 12205. DE-RISKING COMPENSATION FUND.

    ``(a) Establishment.--There is established in the Treasury of the
United States a fund, to be known as the `De-Risking Compensation Fund'
(referred to in this section as the `Fund'), consisting of--
            ``(1) the premiums collected under section 12203(d)(1); and
            ``(2) such amounts as are appropriated to the Fund pursuant
        to subsection (c).
    ``(b) Use of Funds.--Amounts in the Fund shall be available,
without further appropriation, solely for--
            ``(1) compensation payments ordered in final judgments
        under section 12204(d)(1); and
            ``(2) the administration of the Program, subject to the
        condition that not more than 5 percent of amounts in the Fund
        shall be available for administrative expenses.
    ``(c) Authorization of Appropriations.--There are authorized to be
appropriated to the Fund such sums as are necessary to carry out this
subtitle.
    ``(d) Limitation.--No payment may be made under this subtitle from
the general fund of the Treasury or any other Federal account if
amounts in the Fund are exhausted.

        ``Subtitle D--Permitting Timelines and Performance Fund

``SEC. 12301. NOTICES OF INITIATION; PROJECT SCHEDULES.

    ``(a) Notices of Initiation for Covered Energy Projects.--
            ``(1) In general.--A project sponsor shall submit a notice
        of initiation for a covered energy project proposed to be
        carried out by the project sponsor to the head of each agency
        from which 1 or more authorizations are anticipated to be
        required to carry out the covered energy project.
            ``(2) Contents.--A notice of initiation under this
        subsection shall include--
                    ``(A) a statement describing the purposes and
                objectives of the proposed covered energy project;
                    ``(B) a concise description of the proposed covered
                energy project, including the general location of the
                proposed covered energy project and a summary of
                geospatial information, if available, illustrating the
                project area and the locations of known environmental,
                cultural, and historic resources, if any;
                    ``(C) a statement identifying all Federal
                financing, environmental reviews, and authorizations
                anticipated to be required to carry out the proposed
                covered energy project; and
                    ``(D) a general description, to the extent
                practicable, of any preliminary and projected future
                stakeholder engagement conducted by the project sponsor
                relating to the covered energy project.
    ``(b) Determination of Completeness.--
            ``(1) In general.--Not later than 30 days after the date of
        receipt of a notice of initiation under subsection (a), the
        applicable lead agency shall determine whether the notice is
        complete in accordance with paragraph (2).
            ``(2) Completeness.--A notice of initiation shall be
        considered to be complete under paragraph (1) if the lead
        agency determines that the notice meets the requirements
        described in subsection (a)(2).
            ``(3) Statement.--
                    ``(A) In general.--A lead agency, on making a
                determination under paragraph (1) that--
                            ``(i) a notice of initiation is complete,
                        shall provide to the project sponsor a
                        statement of the determination; or
                            ``(ii) a notice of initiation is
                        incomplete, shall provide to the project
                        sponsor a deficiency statement identifying the
                        information required for the notice to be
                        considered complete.
                    ``(B) Failure to act.--If a lead agency fails to
                issue a statement under this paragraph by the
                applicable deadline described in paragraph (1), the
                applicable notice of initiation shall be deemed to be
                complete.
            ``(4) Effect of deficiency.--
                    ``(A) Response by project sponsor.--If a lead
                agency issues a deficiency statement under paragraph
                (3)(A)(ii), the project sponsor may--
                            ``(i) submit to the lead agency a revised
                        notice containing the information identified in
                        the deficiency statement by not later than 90
                        days after the date on which the deficiency
                        statement is issued; or
                            ``(ii) request an extension of time to
                        prepare such a revised notice.
                    ``(B) Extension.--On receipt of a request for an
                extension under subparagraph (A)(ii), a lead agency
                shall grant the applicable project sponsor an extension
                of the applicable deadline under subparagraph (A)(i)
                for a period of not more than 90 days.
    ``(c) Project Schedule.--Not later than 30 days after the date on
which a notice of initiation for a proposed covered energy project is
determined or deemed to be complete under subsection (b), the
applicable lead agency shall publish a schedule for the covered energy
project that--
            ``(1)(A) lists each authorization required for the covered
        energy project; and
            ``(B) identifies each such authorization as a routine
        authorization or a complex authorization, in accordance with
        subsection (d);
            ``(2) identifies each Federal, State, Tribal, and local
        agency that has been designated as a cooperating agency for the
        covered energy project in accordance with the National
        Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), if
        applicable; and
            ``(3) establishes for the covered energy project--
                    ``(A) interim milestones; and
                    ``(B) final decision dates in accordance with
                section 12302.
    ``(d) Identification of Authorizations.--
            ``(1) In general.--For each authorization required for a
        covered energy project for which a schedule is published under
        subsection (c), the lead agency shall identify the
        authorization as--
                    ``(A) a complex authorization if the authorization
                is--
                            ``(i) described in paragraph (2); or
                            ``(ii) designated by the lead agency
                        pursuant to paragraph (3)(A); or
                    ``(B) a routine authorization if the authorization
                is not identified as a complex authorization under
                subparagraph (A).
            ``(2) Description of complex authorizations.--A complex
        authorization referred to in paragraph (1)(A)(i) is an
        authorization that--
                    ``(A) requires the issuance of an authorization or
                certification of public convenience and necessity under
                section 3(e) or 7(c) of the Natural Gas Act (15 U.S.C.
                717b(e), 717f(c));
                    ``(B) requires the issuance of a license or permit
                under section 4(e) or 216 of the Federal Power Act (16
                U.S.C. 797(e), 824p);
                    ``(C) requires the issuance of a lease, easement,
                right-of-way, or other authorization under section 5 or
                8(p) of the Outer Continental Shelf Lands Act (43
                U.S.C. 1334, 1337(p));
                    ``(D) requires the preparation of an environmental
                assessment or environmental impact statement;
                    ``(E) requires formal consultation under section 7
                of the Endangered Species Act of 1973 (16 U.S.C. 1536)
                or results in the issuance of a biological opinion;
                    ``(F) requires consultation under section 306108 of
                title 54, United States Code;
                    ``(G) grants a new or expanded right-of-way,
                easement, lease, or comparable real property interest
                exceeding 20 acres of Federal property; or
                    ``(H) requires an individual permit under section
                404 of the Federal Water Pollution Control Act (33
                U.S.C. 1344) or an individual water quality
                certification under section 401 of that Act (33 U.S.C.
                1341).
            ``(3) Designations by lead agency.--
                    ``(A) In general.--A lead agency may designate an
                authorization as a complex authorization based on a
                written, reasoned determination of the lead agency that
                identifies factors that--
                            ``(i) are specific to the applicable
                        covered energy project; and
                            ``(ii) are not described in subparagraphs
                        (A) through (H) of paragraph (2).
                    ``(B) Judicial review.--The designation by a lead
                agency of a complex authorization pursuant to
                subparagraph (A) shall be subject to judicial review by
                the applicable reviewing court under subtitle E.

``SEC. 12302. AUTHORIZATION DEADLINES.

    ``(a) Definition of Completed Notice Date.--In this section, the
term `completed notice date', with respect to a covered energy project,
means the date on which the notice of initiation under section 12301(a)
for the covered energy project is--
            ``(1) determined to be complete under section 12301(b)(1);
        or
            ``(2) deemed to be complete under section 12301(b)(3)(B).
    ``(b) Deadlines.--Each agency that receives from a project sponsor
a notice of initiation under section 12301(a) for a covered energy
project shall issue a final decision regarding each authorization for
the covered energy project that is under the jurisdiction of the agency
by not later than--
            ``(1) the date that is 90 days after the completed notice
        date of the covered energy project, if the authorization is a
        routine authorization; and
            ``(2) the date that is 1 year after the completed notice
        date of the covered energy project, if the authorization is a
        complex authorization, except as provided in subsection (c).
    ``(c) Extension for Environmental Impact Statements.--If the lead
agency publishes a notice of intent to prepare an environmental impact
statement for a covered energy project after the completed notice date
of the covered energy project, the deadline for completion of the
environmental impact statement shall be the date that is 2 years after
the completed notice date.
    ``(d) Earlier Deadlines Under Other Federal Law.--If another
Federal law requires an agency to issue a final decision regarding an
authorization by a date that is earlier than the deadline applicable
under subsection (b) or (c), the agency shall issue the final decision
not later than that earlier date.
    ``(e) Failure To Meet Deadline.--
            ``(1) In general.--Except as provided in paragraph (2), the
        failure by an agency to adhere to a deadline under this section
        or a milestone under section 12301(c)(3)(A) shall be--
                    ``(A) considered to be a final agency action
                unlawfully withheld or unreasonably delayed under
                section 706 of title 5, United States Code; and
                    ``(B) subject to review by a reviewing court under
                subtitle E or the United States Court of Federal Claims
                under subtitle C.
            ``(2) Exceptions.--The failure by an agency to adhere to a
        deadline under this section or a milestone under section
        12301(c)(3)(A) shall not be considered to be a final agency
        action unlawfully withheld or unreasonably delayed under
        section 706 of title 5, United States Code, if--
                    ``(A) the project sponsor and the agency agree to a
                different deadline or milestone; or
                    ``(B) a reviewing court determines that--
                            ``(i) a natural disaster reasonably
                        impaired the ability of the agency to adhere to
                        the deadline or milestone; or
                            ``(ii) a national emergency or
                        extraordinary circumstance exists for which the
                        only available remedy is to delay the deadline
                        or milestone.

``SEC. 12303. REVIEWING COURT-APPROVED CONTRACTORS.

    ``(a) Definition of Eligible Project.--In this section, the term
`eligible project' means a covered energy project with respect to which
a reviewing court has--
            ``(1) found that an agency has failed to adhere to a
        deadline or milestone; and
            ``(2) issued an order described in section 12404(b)(2)(C).
    ``(b) Project Sponsor Request.--
            ``(1) In general.--On receipt of a request from the project
        sponsor of an eligible project, a reviewing court may authorize
        the project sponsor to retain a qualified contractor to
        complete any necessary analysis or documentation, in accordance
        with this subsection.
            ``(2) Inclusions.--A project sponsor request under
        paragraph (1) shall include--
                    ``(A) identifying information for the contractor
                proposed to be hired by the project sponsor; and
                    ``(B) the qualifications of that contractor,
                including--
                            ``(i) relevant professional credentials;
                            ``(ii) prior experience with Federal
                        environmental reviews; and
                            ``(iii) disclosure of any potential
                        conflicts of interest that are material to the
                        work to be performed, including--
                                    ``(I) any financial interest in the
                                outcome of the applicable eligible
                                project;
                                    ``(II) any contingent or success-
                                based compensation arrangement;
                                    ``(III) any engagement with the
                                project sponsor;
                                    ``(IV) any equity ownership with a
                                10-percent or greater interest;
                                    ``(V) any contractual relationship,
                                during the 2-year period preceding the
                                date of the request, between the
                                contractor and an engineering,
                                procurement, or construction firm
                                acting as a prime contractor for the
                                eligible project; and
                                    ``(VI) any current engagement
                                related to the eligible project.
            ``(3) Approval.--
                    ``(A) In general.--Not later than 30 days after the
                date of receipt of a request of a project sponsor under
                this subsection, the reviewing court shall approve or
                reject the proposed contractor that is the subject of
                the request based on--
                            ``(i) the demonstrated technical competence
                        of the contractor for the required analyses;
                            ``(ii) the absence of disqualifying
                        conflicts of interest;
                            ``(iii) the agreement of the contractor--
                                    ``(I) to operate under the
                                technical guidance of the applicable
                                agency;
                                    ``(II) to maintain independence in
                                professional judgment; and
                                    ``(III) to proceed under the
                                direction of the reviewing court if the
                                agency fails to provide technical
                                guidance or timely review by an
                                applicable deadline under subsection
                                (g); and
                            ``(iv) a determination by the reviewing
                        court regarding whether the contractor meets
                        the qualifications described in subparagraph
                        (B).
                    ``(B) Qualifications.--The qualifications referred
                to in subparagraph (A)(iv), with respect to a
                contractor, are that the contractor--
                            ``(i) holds a recognized professional
                        license or certification applicable to the
                        work, or has demonstrably comparable expertise;
                            ``(ii) has demonstrated experience
                        completing similar analyses for agencies during
                        the preceding 5-year period;
                            ``(iii) is not debarred or suspended from
                        Federal contracting; and
                            ``(iv) maintains professional liability
                        insurance of not less than $1,000,000.
                    ``(C) Form of approval.--The approval of a
                reviewing court under this paragraph may include any
                conditions or limitations necessary to ensure
                compliance with applicable law.
    ``(c) Standards and Obligations.--
            ``(1) In general.--A contractor approved by a reviewing
        court under subsection (b) shall--
                    ``(A) follow applicable laws and regulations,
                guidance documents, and technical standards relevant to
                the analyses performed by the contractor;
                    ``(B) certify under penalty of perjury that all
                work product of the contractor meets the applicable
                legal requirements;
                    ``(C) maintain professional independence from the
                applicable project sponsor in all technical
                determinations and analyses;
                    ``(D) remain subject to applicable professional
                liability and ethical standards; and
                    ``(E) execute a sworn conflict of interest and
                relationship disclosure, as described in subsection
                (b)(2)(B)(iii), and maintain a log of material
                communications with the project sponsor, which shall be
                made available to the reviewing court and any
                applicable agency on request.
            ``(2) Status of work product.--All work product of a
        contractor approved under this section shall be--
                    ``(A) deemed to be received by the applicable
                agency on submission by the contractor; and
                    ``(B) included in the administrative record
                relating to each relevant authorization.
    ``(d) Payment.--
            ``(1) In general.--All reasonable costs of a contractor
        approved by a reviewing court under this section, including the
        costs of studies, modeling, and coordination, shall be paid--
                    ``(A) by the relevant lead agency from amounts in
                the Permitting Performance Fund established by section
                12304(a); and
                    ``(B) at rates not higher than comparable rates on
                the Federal Supply Schedule of the General Services
                Administration, or as otherwise determined to be
                reasonable by the reviewing court.
            ``(2) Advances.--
                    ``(A) In general.--A project sponsor may advance to
                a contractor approved under this section payment for
                any costs described in paragraph (1).
                    ``(B) Reimbursement.--The relevant lead agency
                shall reimburse a project sponsor that makes an advance
                payment under subparagraph (A) by not later than 30
                days after the date on which the project sponsor
                submits to the lead agency an invoice relating to the
                advance payment.
    ``(e) Scope of Work.--A contractor approved by a reviewing court
under this section shall prepare only the documentation necessary to
complete the relevant administrative record.
    ``(f) Production of Government Information.--
            ``(1) In general.--On a motion of the project sponsor or a
        contractor approved by a reviewing court under this section,
        the reviewing court may order any Federal, State, or local
        agency to produce, by a date certain, any document, data, or
        expert input necessary to complete the relevant administrative
        record.
            ``(2) No tolling.--A failure by an agency to produce a
        document, data, or input by the applicable date under paragraph
        (1) shall not toll any deadline under this title.
    ``(g) Deadlines for Contractor Work.--A reviewing court shall
establish deadlines for deliverables of a contractor approved by the
reviewing court under this section, subject to the condition that such
a deadline shall not exceed--
            ``(1) 120 days for a complex authorization not requiring an
        environmental impact statement; and
            ``(2) 240 days for a complex authorization requiring an
        environmental impact statement.
    ``(h) Agency Decisions on Contractor-Prepared Record.--
            ``(1) Agency action.--Not later than 30 days after the date
        on which a contractor approved by a reviewing court under this
        section submits to an applicable agency the completed
        documentation prepared by the contractor, the agency shall--
                    ``(A) issue a final decision regarding the
                applicable authorization, based on the documentation;
                or
                    ``(B) identify, including a citation to the
                applicable law or regulation, any specific legal
                deficiency in the documentation that requires
                correction, subject to paragraph (2)(C).
            ``(2) Deficiencies.--
                    ``(A) In general.--If an agency identifies a
                deficiency under paragraph (1)(B), the affected
                contractor shall correct the deficiency by not later
                than 90 days after the date on which the identification
                occurs.
                    ``(B) Action by agency.--Not later than 14 days
                after the date of receipt of corrected documentation
                under subparagraph (A), an agency shall issue a final
                decision regarding the applicable authorization.
                    ``(C) Single identification.--An agency may
                identify deficiencies under paragraph (1)(B) on only 1
                occasion, unless the applicable reviewing court
                approves another identification for good cause based on
                a legal requirement that was not in effect at the time
                of the initial identification of deficiencies.
            ``(3) Limitation.--An agency may not reject any
        documentation prepared by a contractor approved by a reviewing
        court under this section based on a policy disagreement or any
        other discretionary factor if the documentation satisfies all
        applicable legal requirements.

``SEC. 12304. PERMITTING PERFORMANCE FUND.

    ``(a) Establishment.--There is established in the Treasury a fund,
to be known as the `Permitting Performance Fund' (referred to in this
section as the `Fund'), consisting of--
            ``(1) any civil penalties assessed under section 12404(c);
            ``(2) such amounts as are transferred to the Fund under
        subsection (c); and
            ``(3) such amounts as are appropriated to the Fund pursuant
        to subsection (d).
    ``(b) Use of Funds.--Amounts in the Fund shall be available,
without further appropriation, to pay the costs of--
            ``(1) any contractor approved by a reviewing court under
        section 12303(b); and
            ``(2) any penalty or award to a project sponsor of
        attorneys' fees and costs ordered by a reviewing court pursuant
        to section 12404(b)(2)(D).
    ``(c) Transfer of Amounts.--
            ``(1) Definition of covered workload.--In this subsection,
        the term `covered workload', with respect to an agency, means
        the total number of authorizations for covered energy projects
        listed in project schedules published under section 12301(c)
        for which the agency was identified as the responsible agency,
        determined by assigning a weight of 1 to each routine
        authorization and a weight of 4 to each complex authorization.
            ``(2) Transfer.--The Secretary of the Treasury shall
        transfer to the Fund from the general management account of any
        agency found by a reviewing court under subtitle E to be liable
        for an unreasonable delay an amount based on the proportion
        that--
                    ``(A) the covered workload of the agency during the
                preceding fiscal year; bears to
                    ``(B) the covered workload of all agencies during
                that preceding fiscal year.
    ``(d) Authorization of Appropriations.--There are authorized to be
appropriated to the Fund--
            ``(1) $50,000,000 for the initial capitalization of the
        Fund; and
            ``(2) thereafter, such sums as are necessary to carry out
        this section.

``SEC. 12305. EFFECTIVE DATE.

    ``(a) In General.--This subtitle shall apply to any notice of
initiation submitted under section 12301(a) for a covered energy
project on or after the date that is 90 days after the date of
enactment of this title.
    ``(b) Pending Projects.--For a covered energy project the notice of
initiation for which is pending on the effective date described in
subsection (a)--
            ``(1) this subtitle shall apply beginning on the date that
        is 120 days after the date of enactment of this title; and
            ``(2) as applicable, the completed notice date (as defined
        in section 12302(a)) shall be deemed to be the date that is 120
        days after that date of enactment.

        ``Subtitle E--Expedited Judicial Review and Enforcement

``SEC. 12401. CAUSES OF ACTION.

    ``(a) In General.--Subject to subsection (b), a project sponsor of
a covered energy project may file a petition in accordance with section
12402 for judicial review of--
            ``(1) a final agency action relating to the covered energy
        project;
            ``(2) an alleged failure by an agency--
                    ``(A) to act on the covered energy project,
                including through unlawful withholding or unreasonable
                delay; or
                    ``(B) to adhere to--
                            ``(i) a milestone established for the
                        covered energy project under section
                        12301(c)(3)(A); or
                            ``(ii) a deadline applicable to the covered
                        energy project under section 12302; or
            ``(3) an order, directive, suspension, revocation, or other
        action described in section 12501(b) of an agency relating to
        the covered energy project.
    ``(b) Single Petition Rule.--
            ``(1) In general.--A project sponsor may file only 1
        petition under this subtitle with respect to any single cause
        of action described in subsection (a).
            ``(2) Multiple grounds.--A project sponsor may file a
        single petition under this subtitle seeking multiple grounds
        for relief.
    ``(c) Relief Sought.--A petition under this subtitle may seek 1 or
more of the following:
            ``(1) Review of an order, directive, or action described in
        section 12501(b).
            ``(2) A court order compelling agency action or other
        relief for an unreasonable delay in the authorization process,
        in accordance with subtitle D.
            ``(3) Review of the designation of an authorization as a
        complex authorization pursuant to section 12301(d)(3).
    ``(d) Intervention.--
            ``(1) In general.--Any person that would have standing
        under article III of the Constitution of the United States to
        challenge or defend the applicable agency action may move to
        intervene in a cause of action under this subtitle.
            ``(2) Ruling.--The reviewing court shall rule expeditiously
        on any motion to intervene under paragraph (1).

``SEC. 12402. PETITION REQUIREMENTS.

    ``(a) Contents.--
            ``(1) Requirements.--A petition under this subtitle shall
        contain an affidavit, together with supporting documentation
        described in paragraph (2), demonstrating the grounds for the
        petition as follows:
                    ``(A) Subtitle f actions.--A petition alleging that
                an agency violated section 12501 with respect to a
                covered energy project shall demonstrate that--
                            ``(i) the agency issued an order or
                        directive, revoked a permit or authorization,
                        or carried out any other action to halt, delay,
                        or otherwise cancel a previously authorized
                        activity in violation of section 12501;
                            ``(ii) the project sponsor has suffered a
                        loss as a direct result of the action described
                        in clause (i); and
                            ``(iii) the compensation sought in the
                        petition does not exceed an amount equal to 125
                        percent of the amount of financial loss
                        suffered by the project sponsor as a result of
                        that action.
                    ``(B) Unreasonable delays.--A petition alleging
                unreasonable delay by an agency with respect to a
                covered energy project shall demonstrate that--
                            ``(i) the petitioner is a project sponsor
                        that has submitted a notice of initiation under
                        section 12301(a) for the covered energy
                        project;
                            ``(ii) the notice was, on such date as the
                        project sponsor shall specify--
                                    ``(I) determined to be complete
                                under section 12301(b)(1); or
                                    ``(II) deemed to be complete under
                                section 12301(b)(3)(B);
                            ``(iii) the applicable deadline for a final
                        decision relating to an authorization for the
                        covered energy project under section 12302 has
                        lapsed without the agency issuing the final
                        decision; and
                            ``(iv) the petitioner has suffered or will
                        suffer harm as a result of the lapse described
                        in clause (iii).
                    ``(C) Designations as complex.--A petition seeking
                review of the designation of an authorization as a
                complex authorization shall demonstrate that the
                written, reasoned determination by the applicable lead
                agency fails to identify project-specific factors that
                justify the designation, in accordance with section
                12301(d)(3).
            ``(2) Documents and other information.--
                    ``(A) In general.--A petition under this subtitle
                shall include, as applicable to each claim asserted in
                the petition--
                            ``(i) all relevant agency correspondence
                        (including any application for an
                        authorization), deficiency notices, and
                        determinations relating to a notice of
                        initiation or project schedule for the
                        applicable covered energy project, if any;
                            ``(ii) a copy of each final agency action,
                        authorization, record of decision,
                        environmental document, or order that is the
                        subject of the petition; and
                            ``(iii) identification, to the maximum
                        extent practicable, of any records similar to
                        the records described in this subparagraph that
                        are unavailable to the petitioner and the
                        reasons for the unavailability.
                    ``(B) Additional information.--A petition for
                judicial review under this subtitle may include other
                available relevant documents, such as expert reports,
                economic analyses, or affidavits from personnel,
                relating to--
                            ``(i) the applicable covered energy
                        project;
                            ``(ii) action or inaction by an applicable
                        agency; or
                            ``(iii) harm suffered by the petitioner.
    ``(b) Naming of Respondents.--
            ``(1) In general.--In a petition under this subtitle
        challenging the schedule for a covered energy project under
        section 12301(c), or the designation of an authorization as a
        complex authorization under section 12301(d)(3), the head of
        the applicable lead agency shall be named as the respondent.
            ``(2) Other causes of action.--In a petition under this
        subtitle relating to a cause of action not described in
        paragraph (1), the head of the agency that carried out the
        applicable final agency action, issued the applicable order or
        directive, or is alleged to have unlawfully withheld or
        unreasonably delayed action shall be named as the respondent.
    ``(c) Filing Dates.--
            ``(1) Final agency actions.--A petition under this subtitle
        of a cause of action described in section 12401(a)(1) shall be
        filed not later than 60 days after the date on which the
        applicable agency action becomes final.
            ``(2) Failures to act.--A petition under this subtitle of a
        cause of action described in section 12401(a)(2) may be filed
        beginning on the day after the date of the applicable missed
        deadline or milestone.
            ``(3) Subtitle f actions.--A petition under this subtitle
        of a cause of action described in section 12401(a)(3) shall be
        filed not later than 30 days after the date on which the
        applicable order, directive, suspension, revocation, or other
        action of an agency is issued or carried out.
    ``(d) Service.--The petitioner shall serve a petition under this
subtitle on--
            ``(1) the Attorney General of the United States;
            ``(2) the head of the lead agency with respect to the
        covered energy project that is the subject of the petition; and
            ``(3) each cooperating agency identified under section
        12301(c)(2) in the project schedule for the covered energy
        project that is the subject of the petition.

``SEC. 12403. JUDICIAL REVIEW.

    ``(a) Venue.--
            ``(1) In general.--A petition under this subtitle may be
        filed, at the election of the project sponsor, in--
                    ``(A) the United States Court of Appeals for the
                District of Columbia Circuit;
                    ``(B) the United States court of appeals for the
                circuit in which--
                            ``(i) the covered energy project is
                        located; or
                            ``(ii) the project sponsor has its
                        principal place of business; or
                    ``(C) any United States district court that would
                have jurisdiction under any other applicable law
                (including any special statutory review provision) to
                review the agency action, order, directive, or failure
                to act that is the subject of the petition.
            ``(2) Exclusive jurisdiction.--
                    ``(A) In general.--The reviewing court in which a
                petition is filed under paragraph (1) shall have
                exclusive jurisdiction over--
                            ``(i) that petition; and
                            ``(ii) any claim under this subtitle with
                        respect to the same cause of action described
                        in section 12401(a).
                    ``(B) Consolidation.--If 1 or more petitions
                concerning the same cause of action described in
                section 12401(a) are filed in more than 1 reviewing
                court, each later-filed petition shall be transferred
                to the reviewing court in which the initial petition
                was filed.
    ``(b) Representation of Respondents.--A respondent named under
section 12402(b) shall be represented in accordance with section 518(a)
of title 28, United States Code.
    ``(c) Standard of Review.--
            ``(1) In general.--The reviewing court shall conduct the
        review of, and reach a decision regarding, a petition under
        this subtitle in accordance with chapter 7 of title 5, United
        States Code.
            ``(2) Administrative record.--
                    ``(A) In general.--Judicial review of a petition
                under this subtitle shall be based on an administrative
                record compiled and certified by the head of the agency
                named in the petition as the respondent under section
                12402(b).
                    ``(B) Multiple respondents.--If multiple agency
                heads are named in a petition as respondents under
                section 12402(b)--
                            ``(i) each agency head shall compile and
                        certify the portions of the record within the
                        custody of that agency; and
                            ``(ii) the lead agency, or such other
                        agency as the reviewing court may require,
                        shall assemble a consolidated record.
                    ``(C) Failures to act.--The administrative record
                relating to a petition under this subtitle for a cause
                of action described in section 12401(a)(2) shall
                include, as applicable--
                            ``(i) the notice of initiation submitted
                        under section 12301(a);
                            ``(ii) any completeness or deficiency
                        designation of that notice under section
                        12301(b);
                            ``(iii) the project schedule published
                        under section 12301(c); and
                            ``(iv) any other materials the reviewing
                        court determines to be necessary to resolve the
                        petition.
    ``(d) Additional Submissions.--In addition to the documents and
information required under section 12402(a)(2), a petitioner shall
submit to the reviewing court, in accordance with a schedule
established by the reviewing court, such other records and documents as
are reasonable and necessary for determination of the appropriate
remedy and the amount of compensation to be ordered.
    ``(e) Discovery and Record Development.--
            ``(1) In general.--There shall be no discovery in a
        proceeding relating to a petition under this subtitle other
        than such discovery as may be ordered by the reviewing court,
        as the reviewing court determines to be reasonable and
        necessary to determine the appropriate remedy and the amount of
        compensation (including compensation for any violation of
        section 12501) to be ordered.
            ``(2) Information, testimony, and documents.--The reviewing
        court may require the submission of such information, the
        testimony of such persons, and the production of such documents
        as the reviewing court determines to be reasonable and
        necessary for purposes of this subsection.

``SEC. 12404. EXPEDITED PROCEDURE; RELIEF; PENALTIES; APPEALS.

    ``(a) Expedited Procedure.--The reviewing court shall--
            ``(1) establish an expedited schedule for briefing and
        disposition relating to a petition under this subtitle; and
            ``(2) absent extraordinary circumstances, issue a decision
        with respect to a petition under this subtitle--
                    ``(A) as expeditiously as practicable; but
                    ``(B) not later than 120 days after the date on
                which the petition is filed.
    ``(b) Available Relief.--
            ``(1) In general.--On a finding by a reviewing court that a
        petitioner is entitled to relief under this subtitle, the
        reviewing court shall grant such legal, equitable, and
        administrative relief as the reviewing court determines to be
        appropriate to effectuate the purposes of this title in
        accordance with paragraph (2), subject to section 12501(b).
            ``(2) Actions by reviewing court.--A reviewing court that
        makes a finding described in paragraph (1) shall--
                    ``(A) hold unlawful and set aside any final agency
                action found to be arbitrary, capricious, an abuse of
                discretion, or otherwise not in accordance with law;
                    ``(B) remand each applicable matter to the
                appropriate agency for further action in accordance
                with the direction of the reviewing court, together
                with a schedule and deadline for completion of those
                actions, which deadline shall not exceed--
                            ``(i) 180 days after the date on which the
                        judgment is issued; or
                            ``(ii) such longer period to which the
                        project sponsor may agree;
                    ``(C) in any case involving unlawful withholding or
                unreasonable delay, issue an order that--
                            ``(i) compels the appropriate agency to
                        act;
                            ``(ii) specifies the date by which each
                        discrete action of the agency shall be
                        completed in order to finalize the agency
                        review and issue a final agency decision; and
                            ``(iii) retains the jurisdiction of the
                        reviewing court to ensure compliance with the
                        order;
                    ``(D) award to a project sponsor that prevails on a
                claim of unreasonable delay under subtitle D reasonable
                attorneys' fees and costs; and
                    ``(E) for any action found to be in violation of
                section 12501, award to the project sponsor just
                compensation sufficient to remedy damages to the
                project sponsor caused by the action.
    ``(c) Penalty for Noncompliance.--
            ``(1) Daily fee.--A reviewing court shall assess against
        any agency found to have failed to comply with a schedule or
        order issued by the reviewing court pursuant to subsection
        (b)(2) a civil penalty in an amount equal to not less than
        $1,000, but not more than $100,000, per day of noncompliance.
        In determining the amount of the penalty within that range, the
        reviewing court shall consider the extent to which the
        noncompliance was within the reasonable control of the agency
        and whether the agency acted with diligence and good faith. A
        civil penalty assessed under this paragraph shall be payable
        only from unobligated amounts available in the general
        management account of the applicable agency, and no transfer or
        payment may be made if that unobligated balance is zero or if
        the transfer would reduce that unobligated balance to zero.
            ``(2) Deposit.--The amounts collected under this subsection
        shall be deposited in the Permitting Performance Fund
        established by section 12304(a).
    ``(d) Appeals.--
            ``(1) District court judgments.--If a petition under this
        subtitle is filed in a United States district court pursuant to
        section 12403(a)(1)(C), any party aggrieved by the judgment of
        the district court may obtain review in the United States court
        of appeals of competent jurisdiction under chapter 83 of title
        28, United States Code, subject to the condition that a notice
        of appeal shall be filed not later than 30 days after the date
        of entry of the judgment.
            ``(2) Court of appeals original petitions.--If a petition
        under this subtitle is filed in a United States court of
        appeals pursuant to subparagraph (A) or (B) of section
        12403(a)(1), further review shall be as otherwise provided by
        law.

``SEC. 12405. ACCELERATION OF CERTAIN CLAIMS BY OTHER PERSONS.

    ``(a) Certain Civil Actions.--A civil action authorized by Federal
law seeking judicial review of a final agency action that constitutes
the issuance, approval, or adoption of a complex authorization for a
covered energy project may be brought in accordance with this section
by a person other than a project sponsor of the covered energy project.
    ``(b) Filing Deadline.--A civil action described in subsection (a)
shall be filed not later than the earlier of--
            ``(1) the date that is 150 days after--
                    ``(A) the date on which the applicable lead agency
                publishes in the Federal Register a notice of the
                relevant final complex authorization; or
                    ``(B) if publication described in subparagraph (A)
                is not required by law, the date on which the lead
                agency first makes a notice described in that
                subparagraph publicly available; and
            ``(2) the applicable statutory deadline with respect to the
        civil action.
    ``(c) Scope.--Judicial review of a civil action described in
subsection (a) shall be limited to the administrative record for the
complex authorization at issue.
    ``(d) Limited Vacatur and Injunctive Relief.--In a civil action
described in subsection (a), the court may--
            ``(1) remand the matter to the applicable agency for
        further action in accordance with the direction of the court;
        and
            ``(2) in addition to such a remand, vacate or enjoin all or
        any part of a final agency action only if the court finds,
        based on the administrative record and any additional evidence
        properly before the court, that failure so to vacate or enjoin
        would result in specific, imminent, and irreparable
        environmental harm that cannot reasonably be avoided or
        mitigated through narrower relief, an additional mitigation
        measure, or expedited correction of the deficiency.
    ``(e) Effect of Section.--Nothing in this section limits the
ability of a project sponsor to bring a claim challenging an
authorization for a covered energy project.

     ``Subtitle F--Limiting Orders Against Fully Permitted Projects

``SEC. 12501. TREATMENT OF FULLY PERMITTED PROJECTS.

    ``(a) Definition of Fully Permitted Project.--In this section, the
term `fully permitted project' means a covered energy project that has
received a substantial majority of the authorizations required for the
covered energy project.
    ``(b) Prohibition.--No agency or Federal official shall issue any
order or directive terminating the construction or operation of a fully
permitted project, revoke any permit or authorization for a fully
permitted project, or take any other action to halt, suspend, delay, or
terminate an authorized activity carried out to support a fully
permitted project unless--
            ``(1) there exists--
                    ``(A) a clear, immediate, and substantiated harm
                for which the Federal order, directive, or action is
                required to prevent, mitigate, or repair; and
                    ``(B) no other viable alternative that would allow
                a previously authorized activity, such as construction,
                to continue; or
            ``(2)(A) an applicable authorization is illegal under
        applicable Federal law; and
                    ``(B) the Federal order, directive, or action is
                the only available remedy to address that illegality.
    ``(c) Limitation on Petitions.--
            ``(1) In general.--No agency may petition a court for
        voluntary remand of an authorization for a fully permitted
        project that has received a record of decision unless the
        project sponsor consents to the petition.
            ``(2) In-camera review.--As necessary, a court may review a
        petition submitted under this subsection in camera.

                      ``Subtitle G--Other Matters

``SEC. 12601. GOVERNMENT ACCOUNTABILITY OFFICE SURVEY AND REPORT.

    ``Not later than 180 days after the date of enactment of this
title, and not less frequently than annually thereafter, the
Comptroller General of the United States shall--
            ``(1) conduct a survey of industry satisfaction with the
        Federal permitting process with respect to covered energy
        projects, which shall--
                    ``(A) include questions relating to--
                            ``(i) related Federal staffing levels and
                        expertise;
                            ``(ii) the costs of the permitting process;
                        and
                            ``(iii) recommendations for improving the
                        permitting process; and
                    ``(B) be carried out so as to accommodate any
                industry group or individual that desires to comment
                anonymously; and
            ``(2) submit to the Committee on Energy and Natural
        Resources of the Senate and the Committee on Natural Resources
        of the House of Representatives a report that includes--
                    ``(A) an evaluation of the ability of agencies to
                adhere to the deadlines under this title;
                    ``(B) an evaluation of whether any energy source
                has been unfairly treated, including through the
                imposition of delays or added requirements, a lack of
                communication, or any other action taken to
                disadvantage the source in the permitting process,
                subject to the condition that it shall not be
                considered unfair treatment for purposes of this
                subparagraph if--
                            ``(i) an energy source is subject to
                        regulation or other measures due to a
                        difference inherent in a specific technology;
                        or
                            ``(ii) an initiative is carried out to
                        improve service--
                                    ``(I) for an industry; or
                                    ``(II) at a field office of the
                                Department of Energy or the Department
                                of the Interior; and
                    ``(C) a description of the results of the most
                recent survey conducted under paragraph (1).''.
    (b) Clerical Amendment.--The table of contents contained in section
101(b) of the Energy Act of 2020 (Public Law 116-260; 134 Stat. 2418)
is amended by adding at the end the following:

  ``TITLE XII--FIGHTING FOR RELIABLE ENERGY AND ENDING DOUBT FOR OPEN
                                MARKETS

                       ``Subtitle A--Definitions

``Sec. 12001. Definitions.
         ``Subtitle B--Federal Land Energy and Mineral Reforms

``Sec. 12101. Accelerating Federal land rights-of-way for certain
                            covered energy projects.
             ``Subtitle C--De-Risking Compensation Program

``Sec. 12201. Definitions.
``Sec. 12202. Establishment; purposes.
``Sec. 12203. Enrollment.
``Sec. 12204. Compensation of enrolled project sponsors.
``Sec. 12205. De-Risking Compensation Fund.
        ``Subtitle D--Permitting Timelines and Performance Fund

``Sec. 12301. Notices of initiation; project schedules.
``Sec. 12302. Authorization deadlines.
``Sec. 12303. Reviewing court-approved contractors.
``Sec. 12304. Permitting Performance Fund.
``Sec. 12305. Effective date.
        ``Subtitle E--Expedited Judicial Review and Enforcement

``Sec. 12401. Causes of action.
``Sec. 12402. Petition requirements.
``Sec. 12403. Judicial review.
``Sec. 12404. Expedited procedure; relief; penalties; appeals.
``Sec. 12405. Acceleration of certain claims by other persons.
     ``Subtitle F--Limiting Orders Against Fully Permitted Projects

``Sec. 12501. Treatment of fully permitted projects.
                      ``Subtitle G--Other Matters

``Sec. 12601. Government Accountability Office survey and report.''.

SEC. 4. GEOTHERMAL LEASING AND PERMITTING IMPROVEMENTS; PERMITTING
              COMPLIANCE ON NON-FEDERAL LAND.

    (a) Geothermal Leasing and Permitting Improvements.--
            (1) Annual leasing.--Section 4(b) of the Geothermal Steam
        Act of 1970 (30 U.S.C. 1003(b)) is amended--
                    (A) in paragraph (2), by striking ``every 2 years''
                and inserting ``per year''; and
                    (B) by adding at the end the following:
            ``(5) Replacement sales.--If a lease sale under this
        section for a year is cancelled or delayed--
                    ``(A) the Secretary shall conduct a replacement
                sale not later than 180 days after the date of the
                cancellation or delay, as applicable; and
                    ``(B) that replacement sale may not be cancelled or
                delayed.''.
            (2) Cost recovery authority.--Section 24 of the Geothermal
        Steam Act of 1970 (30 U.S.C. 1023) is amended--
                    (A) by striking the section designation and all
                that follows through ``(b) development'' in the second
                sentence and inserting the following:

``SEC. 24. RULES AND REGULATIONS.

    ``(a) In General.--The Secretary shall prescribe such rules and
regulations as the Secretary determines to be appropriate to carry out
this Act.
    ``(b) Inclusions.--The regulations prescribed pursuant to
subsection (a) may include, without limitation, provisions relating
to--
            ``(1) the prevention of waste;
            ``(2) the development'';
                    (B) in subsection (b) (as so designated)--
                            (i) in paragraph (2) (as so designated), by
                        striking ``resources, (c) the'' and inserting
                        the following: ``resources;
            ``(3) the'';
                            (ii) in paragraph (3) (as so designated),
                        by striking ``interest, (d) assignment'' and
                        inserting the following: ``interest;
            ``(4) assignment'';
                            (iii) in paragraph (4) (as so designated),
                        by striking ``agreements, (e) compensatory''
                        and inserting the following: ``agreements;
            ``(5) compensatory'';
                            (iv) in paragraph (5) (as so designated),
                        by striking ``royalties, (f) the'' and
                        inserting the following: ``royalties;
            ``(6) the'';
                            (v) in paragraph (6) (as so designated), by
                        striking ``resources, (g) use'' and inserting
                        the following: ``resources;
            ``(7) the use'';
                            (vi) in paragraph (7) (as so designated),
                        by striking ``his lease, (h) the'' and
                        inserting the following: ``a lease;
            ``(8) the''; and
                            (vii) in paragraph (8) (as so designated),
                        by striking ``program, and (i) protection'' and
                        inserting the following: ``program; and
            ``(9) protection''; and
                    (C) by adding at the end the following:
    ``(c) Cost Recovery.--Not later than 180 days after the date of
enactment of the FREEDOM Act, the Secretary shall prescribe rules
pursuant to this section for cost recovery, to be paid by permit
applicants or lessees--
            ``(1) to facilitate the timely coordination and processing
        of leases, permits, and authorizations; and
            ``(2) to reimburse the Secretary for all reasonable
        administrative costs incurred from the inspection and
        monitoring of activities carried out under the permit, lease,
        or other authorization, as applicable.''.
            (3) Federal permitting process.--Not later than 1 year
        after the date of enactment of this Act, the Secretary of the
        Interior shall promulgate regulations and establish a Federal
        permitting process to allow for simultaneous, concurrent
        consideration of multiple phases of a geothermal project,
        including--
                    (A) surface exploration;
                    (B) geophysical exploration (including well
                drilling);
                    (C) production well drilling; and
                    (D) use of geothermal resources (including power
                plant construction).
            (4) Geothermal production parity.--Section 390 of the
        Energy Policy Act of 2005 (42 U.S.C. 15942) is amended--
                    (A) in subsection (a)--
                            (i) by striking ``(NEPA)'' and inserting
                        ``(42 U.S.C. 4321 et seq.) (referred to in this
                        section as `NEPA')'';
                            (ii) by inserting ``(30 U.S.C. 181 et
                        seq.)'' after ``Mineral Leasing Act''; and
                            (iii) by inserting ``or the Geothermal
                        Steam Act of 1970 (30 U.S.C. 1001 et seq.) for
                        the purpose of exploration or development of
                        geothermal resources'' before the period at the
                        end; and
                    (B) in subsection (b)--
                            (i) in paragraph (2), by striking ``oil or
                        gas'' and inserting ``oil, gas, or geothermal
                        resources''; and
                            (ii) in paragraph (3), by striking ``oil or
                        gas'' and inserting ``oil, gas, or geothermal
                        resources''.
            (5) Geothermal ombudsman.--
                    (A) In general.--Not later than 60 days after the
                date of enactment of this Act, the Secretary of the
                Interior shall appoint within the Bureau of Land
                Management a Geothermal Ombudsman.
                    (B) Duties.--The Geothermal Ombudsman appointed
                under paragraph (1) shall--
                            (i) act as a liaison between--
                                    (I) the individual field offices of
                                the Bureau of Land Management;
                                    (II) the Division Chief of the
                                National Renewable Energy Coordination
                                Office of the Bureau of Land
                                Management; and
                                    (III) the Director of the Bureau of
                                Land Management;
                            (ii) provide dispute resolution services
                        between the individual field offices of the
                        Bureau of Land Management and applicants for
                        geothermal resource permits;
                            (iii) monitor and facilitate permit
                        processing practices and timelines across
                        individual field offices of the Bureau of Land
                        Management;
                            (iv) develop best practices for the
                        permitting and leasing process for geothermal
                        resources; and
                            (v) coordinate with the Federal Permitting
                        Improvement Steering Council.
                    (C) Report.--The Geothermal Ombudsman appointed
                under paragraph (1) shall submit to the Committee on
                Energy and Natural Resources of the Senate and the
                Committee on Natural Resources of the House of
                Representatives an annual report that--
                            (i) describes the activities carried out by
                        the Geothermal Ombudsman during the preceding
                        year; and
                            (ii) evaluates the effectiveness of
                        geothermal permit processing during the
                        preceding year.
    (b) Permitting Compliance on Non-Federal Land.--
            (1) Certain oil and gas activities on non-federal
        surface.--
                    (A) In general.--Notwithstanding the Mineral
                Leasing Act (30 U.S.C. 181 et seq.), the Federal Oil
                and Gas Royalty Management Act of 1982 (30 U.S.C. 1701
                et seq.), or subpart 3162 of part 3160 of title 43,
                Code of Federal Regulations (or successor regulations),
                but subject to any applicable State or Tribal
                requirements and subparagraph (C), the Secretary of the
                Interior shall not require a permit to drill for an oil
                and gas lease under the Mineral Leasing Act (30 U.S.C.
                181 et seq.) for any action occurring within an oil and
                gas drilling or spacing unit if--
                            (i) the Federal Government--
                                    (I) owns fewer than 50 percent of
                                the minerals within the oil and gas
                                drilling or spacing unit; and
                                    (II) does not own or lease the
                                surface estate within the area directly
                                impacted by the drilling;
                            (ii) the well is located on non-Federal
                        land overlying a non-Federal mineral estate,
                        but some portion of the wellbore enters and
                        produces from the Federal mineral estate
                        subject to the lease; or
                            (iii) the well is located on non-Federal
                        land overlying a non-Federal mineral estate,
                        but some portion of the wellbore traverses but
                        does not produce from the Federal mineral
                        estate subject to the lease.
                    (B) State permits to drill and drilling plans.--For
                each State permit to drill or drilling plan that would
                impact or extract oil and gas owned by the Federal
                Government--
                            (i) each lessee of Federal minerals in the
                        unit (or a designee) shall--
                                    (I) notify the Secretary of the
                                Interior of the submission of a State
                                application for a permit to drill or
                                drilling plan on submission of the
                                application; and
                                    (II) provide to the Secretary of
                                the Interior a copy of the application
                                described in subclause (I) not later
                                than 5 days after the date on which the
                                permit or plan is submitted;
                            (ii) each lessee described in clause (i)
                        (or a designee), and each applicable State,
                        shall notify the Secretary of the Interior of
                        the approved State permit to drill or drilling
                        plan not later than 45 days after the date on
                        which the permit or plan is approved; and
                            (iii) as a condition of commencing drilling
                        operations, each lessee described in clause (i)
                        (or a designee) shall provide to the Secretary
                        of the Interior an agreement authorizing the
                        Secretary of the Interior to enter non-Federal
                        land, as necessary for inspection and
                        enforcement of the terms of the Federal lease.
                    (C) Nonapplicability to indian lands.--Subparagraph
                (A) shall not apply to Indian lands (as defined in
                section 3 of the Federal Oil and Gas Royalty Management
                Act of 1982 (30 U.S.C. 1702)).
                    (D) Effect.--Nothing in this paragraph affects--
                            (i) other authorities of the Secretary of
                        the Interior under the Federal Oil and Gas
                        Royalty Management Act of 1982 (30 U.S.C. 1701
                        et seq.); or
                            (ii) the amount of royalties due to the
                        Federal Government from the production of the
                        Federal minerals within an oil or gas drilling
                        or spacing unit.
            (2) Permitting compliance for certain geothermal activities
        on non-federal surface.--The Geothermal Steam Act of 1970 (30
        U.S.C. 1001 et seq.) is amended by adding at the end the
        following:

``SEC. 30. NO FEDERAL DRILLING PERMIT REQUIRED FOR CERTAIN GEOTHERMAL
              ACTIVITIES ON NON-FEDERAL SURFACE.

    ``(a) Prohibition.--The Secretary shall not require an operator to
obtain a Federal drilling permit or equivalent Federal drilling
approval for any geothermal exploration or production activity
conducted on a non-Federal surface estate, subject to the conditions
that--
            ``(1) the United States holds an ownership interest of less
        than 50 percent of the subsurface geothermal estate to be
        accessed by the proposed action; and
            ``(2) the operator shall submit to the Secretary a State
        permit or other State authorization to conduct geothermal
        exploration or production activities on the non-Federal surface
        estate, in accordance with subsection (b).
    ``(b) State Permits and Authorizations.--
            ``(1) Application.--On submission to an applicable State by
        an operator described in subsection (a) of an application for a
        State permit or authorization described in subsection (a)(2),
        the operator shall--
                    ``(A) notify the Secretary of the submission; and
                    ``(B) not later than 5 days after the date of the
                submission, provide to the Secretary a copy of the
                application.
            ``(2) Approval notice.--Not later than 45 days after the
        date on which the State permit or other State authorization is
        approved by the applicable State, the operator or the State
        shall notify the Secretary of the approval.
            ``(3) Access agreements.--As a condition of commencing
        operations under this section, an operator shall provide to the
        Secretary an agreement authorizing the Secretary to enter non-
        Federal land, as necessary for inspection and enforcement of
        the terms of any applicable Federal geothermal lease, including
        for production accountability and royalty verification.
    ``(c) Royalties and Production Accountability.--
            ``(1) Royalties.--Nothing in this section affects the
        amount of royalties due to the United States under this Act
        from the production or use of geothermal resources or
        byproducts.
            ``(2) Inspections.--The Secretary may conduct onsite
        reviews and inspections to ensure proper accountability,
        measurement, and reporting of production and payment of
        royalties under this Act.
    ``(d) Exceptions.--This section shall not apply to--
            ``(1) any action carried out on--
                    ``(A) land located within the boundaries of an
                Indian reservation, pueblo, or rancheria; or
                    ``(B) land not located within the boundaries of an
                Indian reservation, pueblo, or rancheria, the title to
                which is held--
                            ``(i) in trust by the United States for the
                        benefit of an Indian Tribe or an individual
                        Indian;
                            ``(ii) by an Indian Tribe or an individual
                        Indian, subject to restriction against
                        alienation under laws of the United States; or
                            ``(iii) by a dependent Indian community; or
            ``(2) any resource managed by the United States, in trust
        for the benefit of an Indian Tribe.''.
            (3) Authority on non-federal land for oil and gas leases.--
        Section 17(g) of the Mineral Leasing Act (30 U.S.C. 226(g)) is
        amended--
                    (A) by striking the subsection designation and all
                that follows through ``Secretary of the Interior, or''
                in the first sentence and inserting the following:
    ``(g) Regulation of Surface-Disturbing Activities.--
            ``(1) In general.--The Secretary of the Interior, or''; and
                    (B) by adding at the end the following:
            ``(2) Effect of mineral leasing act.--
                    ``(A) In general.--In the case of an oil and gas
                lease under the Mineral Leasing Act on land described
                in subparagraph (B) that is located within an oil and
                gas drilling or spacing unit, nothing in this Act
                authorizes the Secretary of the Interior--
                            ``(i) to require a bond to protect non-
                        Federal land;
                            ``(ii) to enter non-Federal land without
                        the consent of the applicable landowner;
                            ``(iii) to impose mitigation requirements;
                        or
                            ``(iv) to require approval for surface
                        reclamation.
                    ``(B) Description of land.--Land referred to in
                subparagraph (A) is land with respect to which--
                            ``(i) the Federal Government--
                                    ``(I) owns fewer than 50 percent of
                                the minerals within the oil and gas
                                drilling or spacing unit; and
                                    ``(II) does not own or lease the
                                surface estate within the area directly
                                impacted by the relevant action;
                            ``(ii) a well is located on non-Federal
                        land overlying a non-Federal mineral estate,
                        but some portion of the wellbore enters and
                        produces from the Federal mineral estate
                        subject to the lease; or
                            ``(iii) a well is located on non-Federal
                        land overlying a non-Federal mineral estate,
                        but some portion of the wellbore traverses but
                        does not produce from the Federal mineral
                        estate subject to the lease.
    ``(e) Definition of Operator.--In this section, the term `operator'
means any person that has taken responsibility in writing, submitted to
the Secretary, for geothermal exploration or production operations
conducted under a lease issued under this Act.''.
                                 <all>

Official legislative text sourced from the public record (cached on CivicsHQ).

Official source

View the original bill, actions, and full legislative record on Congress.gov.

View on Congress.govopen_in_new

Status

In Committee

  1. 1Introduced
  2. 2Committee
  3. 3Floor
  4. 4Passed
  5. 5Signed

Timeline reflects current normalized status only. Full action history is not yet stored in the API.

Votes

Voting records are not yet available for this bill.